Its purpose is to assist electrical contractors engineers architects and manufacturers engaged in the installation of electrical service wiring and equipment.
Electrical service panel height requirements.
Nec 230 54 electrical services service entrance raceways shall be rain tight and arranged to drain.
The circuit breaker at the top of the box may not be higher than 6 foot 7 inches from the floor.
Minimum height requirements for service drop cables are determined by the local building or electrical codes but most follow the recommendations of the national electrical code nec.
Service drop height requirements.
According to the 2008 national electrical code most residential electrical panels require at least a 3 foot clearance or working space in front 30 inches of width and a minimum headroom clearance of 6 feet or the height of the equipment whichever is greater.
In general a service drop must be at least 12 feet above the ground grade as well as sidewalks and residential driveways.
Electrical equipment must have a minimum 30 wide clear working space laterally in front of.
Electric service panels have a number of different names.
The national electrical code has a few restrictions on where electrical panels may be located as follows.
These standards set the minimum safety standards for panel boxes.
Nec 110 26 requires electrical equipment including electrical panels to be located to provide required working clearances about the equipment.
The nec requirements say that electrical equipment must be in an area measuring 30 inches.
Three of these standards concern the box location clearance and space around the box and box height.
A permanent platform must be below the panel box if the top circuit breaker exceeds this specific height.
Fuse box fuse panel circuit breaker panel today most homes have what is officially called the electrical service panel or simply the service panel a circuit breaker panel is not exactly the same as the fuse box because it has mechanical toggle switch circuit breakers not fuses but.
If obstacles would make it unsafe for you to inspect the service panel you have.
A height limit applies to mounting a panel box.
The second sentence in 110 26 a 3 states that within this section s height requirements other equipment located above or below the electrical equipment can extend beyond the front of the equipment but the difference in depth shall not be more than 6 inches.
The national electric code nec includes the minimum standards for installing a circuit breaker panel box.
Nec 230 70 electrical services the service disconnecting means shall be installed at a readily accessible location either outside a building or structure or inside nearest the point of entrance of the service entrance conductors.